JIG compliancy inspection for jet-A1 tanks (click for compositions)

JIG requirements are demanding a 100% slope. RoNik Inspectioneering 3D scanning and modelling are showing 0.5% accuracy.

Compositions of the floor and the wall of the floating roof tank attached are showing the areas of modification bringing the tank into JIG compliancy.